***** URGENT *****           .... Do you have any used or surplus Electrical Distribution Equipment? If so, give us a call on 0113 2263384 or click here for further details....           ***** URGENT *****           We are interested in buying used or surplus Masterpact M Air Circuit Breakers and accessories (M08 - M63); Compact C Moulded Case Circuit Breakers (C401 - C1251); Yokshire Switchgear YSF6 Gas Circuit Breakers; Merlin Gerin Ringmaster Range Ring Main Units (RN2c / RN6c / RE2c); Merlin Gerin Ringmaster Range Circuit Breakers (CN2 / CN6 / CE2 / CE6), Switches (SN6 / SE6) and Metering Units (MU2); and 11kV/415V air or oil cooled transformers....           ***** URGENT *****           .... Click here for more details....

Product Categories

Yorkshire Switchgear ==> Trip and Close Assembly

Technical Details

  • Brand:
  • Delivery Options: Category
  • Catalogue Page:
  • Product Selection Table
    Product Ref
    (click for more info)
    Description Lead Time Sales Unit Special Offer Price Add to Basket
    1A13220C0 Sa Trip Lever (Manual ) 10 working weeks Each £p.o.a.
    1A13221F0 Close Levers 4 working weeks Each £p.o.a.
    1A13222Q0 Trip/Close Control Plate 8 working weeks Each £p.o.a.
    550503000 110V Dc Coil 4 working weeks Each £p.o.a.
    550503100 30V Dc Stc /Close Coil 4 working weeks Each £p.o.a.
    550503200 110V Dc Closing Coil/Tripping Coil 6 working weeks Each £p.o.a.
    550503400 30V Dc Coil 4 working weeks Each £p.o.a.
    550503500 125V Dc Coil 4 working weeks Each £p.o.a.
    550503600 24V Dc Stc/Src Assy 4 working weeks Each £p.o.a.
    550503700 24V Dc Coil 4 working weeks Each £p.o.a.
    550503800 48V Dc Coil 4 working weeks Each £p.o.a.
    550503900 48V Dc Stc/Src 6 working weeks Each £p.o.a.
    550504500 220/250 Dc Coil 4 working weeks Each £p.o.a.
    550504600 220/250V Dc Stc/Src 4 working weeks Each £p.o.a.
    550504700 110V Ac No Volt Trip Coil Assy 4 working weeks Each £p.o.a.
    550504800 110V Ac No Volt Coil 4 working weeks Each £p.o.a.
    550505000 30V Dc Src 4 working weeks Each £p.o.a.
    550505100 110V Dc Src 4 working weeks Each £p.o.a.
    550505400 Double Trip Coil Kit (Excl.Coils) 4 working weeks Each £p.o.a.
    550506600 48V Dc Src 4 working weeks Each £p.o.a.
    550508600 Motor Rewind Kit Of Parts 8 working weeks Each £p.o.a.
    Continue Shopping